What a water treatment buyer screens for
Supplier questionnaires in this sector mostly ask the same things: catalogue width, export markets, years in business, price. None of them predict whether the boxes that arrive carry documents your engineer can sign off. Three documents do, and all three can be checked in an afternoon.
- An EN 10204 type 3.1 inspection certificate issued for your lot. Not a datasheet. The certificate carries the heat number, the measured chemistry and the measured mechanical properties, and it is issued by an inspection function independent of production.
- A heat number that runs unbroken from that certificate to the box in front of you. Head marking or unit label, packing list, certificate. Break the chain anywhere and the certificate describes a different batch.
- A PMI re-check on arrival, on a sampling basis written into the purchase order. Handheld XRF or OES, accepted on Cr, Ni and Mo. This is what catches a grade substitution before it reaches a flange.
Ask for all three against a sample order. A supplier who can produce them on a trial will produce them on the contract. One who cannot usually cannot be rescued by a discount.
| Document | What it proves | What it does not prove |
|---|---|---|
| EN 10204 type 3.1 | Chemistry and mechanical results for the heat, issued independently of production | That the parts in this box came from that heat |
| Heat number on label and packing list | The link between the document and the goods | That the marking itself is genuine |
| PMI report on arrival | The alloy matches the grade ordered | Heat treatment, strength, coating thickness |
Everything else on the questionnaire is easier to produce than these three and tells you less.
Our plant and our channel coverage
We are the export and engineering arm of a Zhejiang fastener manufacturing group. We have our own plant, and we work through an inspected partner network in Hebei, Ningbo, Shenzhen and Wenzhou. Both are part of what we supply, and both are quoted the same way: against your specification, with the documents agreed before the price.
What the arrangement changes for a buyer is the number of document sets you have to reconcile. A water treatment order usually mixes families, stainless hex bolts on the flanges, galvanized anchors for the grating, gaskets between them. Split across three suppliers that becomes three certificate packs and three shipments to chase. Through one order it is one document set and one place to ask when a heat number does not match.
Our part on an order has three pieces: technical selection against your service conditions, fixing the inspection and document points before the price is agreed, and quoting from a costed floor rather than a list price. More on the company in about Yaxiio.
Grade map: A4-70 and ISO 3506-1
A2 and A4 are the ISO 3506-1 markings buyers see on the head: A2 for the 304 family, A4 for the 316 and 316L family. The two digits are the property class. A4-70 and A4-80 differ in the strength the standard requires, not in the alloy, and the marking on the head has to match the class on the certificate. When they disagree, you have two documents describing two different products.
GB/T 3098.6 is the Chinese standard for the mechanical properties of stainless fasteners. A mill in Ningbo may certify to it where a European mill certifies to ISO 3506-1, and for the classes used here the two describe the same requirement. What you verify is the class and the measured values, not which logo sits at the top of the page.
| Marking | Material | Standard to cite | Where it fits | Check on the certificate |
|---|---|---|---|---|
| A2-70 | 304 | ISO 3506-1 / GB/T 3098.6 | Low-chloride clean water | Class, heat, chemistry |
| A4-70 | 316L | ISO 3506-1 / GB/T 3098.6 | Chloride-bearing process water | Molybdenum content, class |
| A4-80 | 316L, higher class | ISO 3506-1 / GB/T 3098.6 | Joints that need more preload | Class against head marking, ductility |
| 2205 | UNS S32205 | ASTM A479 / A276 | High chloride, or chloride with heat | Grade, chemistry, proof strength on the MTC |
Two notes. A4-80 is cold worked further than A4-70, which raises proof strength and makes galling more likely, so specify it for the joint that needs the preload rather than by default. Duplex 2205 is not an A4 grade; it is specified by UNS number against an ASTM product specification, with the mechanical properties stated on the certificate.
Which of the three suits your section is a separate question, covered in water treatment flange bolts by chloride and temperature. The grade follows the service, not the catalogue.
The document pack in detail
EN 10204 numbers the document by who issues it and what data it carries. Type 3.1 is an inspection certificate issued by the manufacturer’s inspection department, independent of production, with test results for the lot supplied. Type 3.2 is the same certificate issued by an inspector nominated by the buyer or by a third party. Type 2.2 is a declaration of conformity with no test results at all.
Ten minutes with a 3.1 certificate:
- Does it name your purchase order, your lot, or the heat?
- Is the heat number the same one on the box label and the packing list?
- Are the chemistry values measured results, or a “typical” column copied from a mill datasheet?
- Does the grade on the certificate match the marking on the head?
- Is the issuing inspection function identified, and separated from production?
- Which standard is cited, and is it the one your purchase order named?
- Are mechanical properties reported for the finished part, or only for the bar it was made from?
Red flags: a certificate with no heat number; the same certificate reused across several shipments; “equivalent grade” wording where your specification named a grade; identical test results across heats that should differ.
Heat traceability. Head stamping has room for little, so many suppliers carry the heat on a unit label or the box instead. Either works as long as it is consistent and the packing list repeats it. What matters is that mixed heats are not packed in one box, and that a box traces back to a heat without a phone call.
PMI. A handheld XRF reads Cr, Ni and Mo in seconds and catches the substitution that matters most, 304 supplied as 316L. OES is more accurate on carbon and light elements, which is worth specifying when the grades are close. PMI says nothing about heat treatment, strength or coating thickness; it is a grade check, not a mechanical test.
Ask for a sample pack before you place the order: one 3.1, one packing list, one PMI report. Request the set we would issue for your specification and check the heat chain on paper first.
Drinking water and pressure scopes
Two scopes add paperwork without changing the alloy logic.
NSF/ANSI 61 covers the health effects of components in contact with drinking water in the US. Certification is per product and per wetted material, and it comes with a listing reference. Ask for the reference and check that the scope covers the item and the size you are buying; a logo on a brochure is not a listing.
WRAS covers water fittings in the UK, on wetted materials and, where relevant, mechanical function.
PED 2014/68/EU applies when the joint is part of a pressure boundary. The equipment manufacturer holds the CE marking and the technical file; the fastener supply contributes the material documentation that supports it, which in practice means EN 10204 3.1 for the pressure-retaining parts.
None of this changes the corrosion question. A certified 304 bolt in a chlorinated room is still the wrong bolt.
Order size, lead time and shipping
Our published order floor is one ton, with sizes combined. Below that we still quote, but set-up and testing cost has to sit somewhere, so send the whole list rather than one line.
| Variable | What it changes | What we confirm in the quote |
|---|---|---|
| Diameter band | Small sizes combine easily; large sizes in small quantity drive the per-piece cost | Price breaks per size, not one blended number |
| Grade | Duplex bar is a separate availability question from 304 or carbon | Grade availability per line |
| Marking | Head stamping, laser, or label only | Which marking the batch will carry |
| Test scope | PMI sampling, extra tensile, impact | What is included and what is charged |
| Packaging | Mixed sizes, desiccant, pallet specification | Packing list per box with heat numbers |
| Shipping | LCL, or a mixed container with flanges and gaskets | Container plan and document set |
Lead time is quoted per line item, not as one number for the order, because a duplex stud and a galvanized hex bolt do not come off the same schedule. A mixed container is worth planning early: bolts, flanges and gaskets arriving together saves the site a reconciliation, and each family keeps its own document set with the packing list tying them together.
One shipping point that gets settled too late: the document pack should travel with the container rather than trail it by a week. The certificate belongs in the box or in the container file, matched to the packing list, so the receiving inspection can start on the day the goods land. A certificate that arrives by email a fortnight after the ship is a certificate nobody checks.
Acceptance and non-conformance
Put the sampling rule in the purchase order instead of leaving it to the inspector’s judgement. GB/T 2828.1 supplies the schemes, and the practical clause reads like this:
- State the inspection level and the AQL separately for critical and cosmetic characteristics. Grade, marking and thread dimensions are critical. A scratch on a head is not, and the two should not share a limit.
- Sample per lot, where lots are defined by heat.
- Verify grade by PMI on the sample, against the certificate.
- Any non-conforming lot is sorted at the supplier’s cost, and the sorted quantity is re-offered for inspection before shipment.
Disposition, in order of preference: replace the lot, sort and replace the defective pieces, or accept with a price adjustment where the deviation does not touch function. What should not happen is a concession that leaves the site to find the bad pieces during installation.
For a repeat failure, ask for the root cause and the containment, not just a replacement. A grade substitution that appears twice is a process problem in incoming material control, and the third shipment will carry it again.
Keep the PMI reports and packing lists in the lot file. When a flange leaks three years later, the certificate is what answers whether the material was what you ordered.
Water treatment applications we supply
Most water treatment fastener demand lands in five places:
- Flanged pipework: studs and hex bolts on plate slip-on flanges, with spiral wound gaskets on higher-pressure joints and non-metallic flat gaskets on low-pressure water lines.
- Access and structure: walkway grating clips, handrail, ladder brackets, mostly atmospheric exposure.
- Dosing and equipment skids: stainless and carbon in one frame, where galvanic isolation matters as much as the grade.
- Sludge handling: dewatering frames and scraper drives, where chloride and vibration arrive together.
- Buried and embedded items: a coating decision more than an alloy decision.
The section decides the grade, and the supplier qualification decides the documents. Bulk hex bolts are the family we quote most often for this sector, and the hex head bolt range covers the dimensional options.
What to send for a quote
Five inputs turn an enquiry into a package that can be priced:
- Specification and standard: size, dimensional standard, property class, material.
- Quantity and how it splits across sizes, so the order floor can be checked honestly.
- Certification requirement: 3.1, PMI on arrival, NSF/ANSI 61 or WRAS, PED scope.
- Project location and delivery terms.
- Acceptance method, including the sampling basis if your QA team uses one.
Send those and the price arrives with the document list attached, which is the version of a price that survives an engineering review.
Frequently asked questions
What is the difference between EN 10204 type 3.1 and 2.2?
Type 3.1 is an inspection certificate carrying the measured results for the lot, issued by the manufacturer’s inspection function independently of production. Type 2.2 is a declaration that the goods conform to the order, with no test data behind it. For pressure-retaining or drinking-water scope, 2.2 does not carry what the reviewer needs.
Is a mill certificate enough on its own?
No. The certificate has to be tied to the parts. The heat number on the document, on the unit or box label and on the packing list must match, and one box should not mix heats. Without that chain the certificate describes some other batch, whatever it says at the top.
Why re-test material that already has a certificate?
Because the failure that matters most is a grade substitution, not a poor heat. A handheld XRF check on arrival catches 304 supplied as 316L in minutes. PMI confirms the alloy; it does not replace mechanical testing or tell you anything about heat treatment.
What is the minimum order for water treatment fasteners?
Our published order floor is one ton, with sizes combined. Below that we still quote, but set-up and testing costs have to sit somewhere, so send the whole list rather than a single line and the answer will be more useful.
Do you supply fasteners certified for drinking water contact?
We supply to the grade and the certification path your project names, and we confirm the document scope before quoting. NSF/ANSI 61 in the US and WRAS in the UK are listed per product and per wetted material, so give us the listing reference your specification calls for and the scope can be checked against the item and size.
How long is delivery?
Lead time is quoted per line item. Diameter, grade, marking and test scope all move it, and duplex bar availability is a separate question from 304 or carbon steel. Send the full list and you get a date per item, not a single number for the order.
Send the list to our engineering desk. We will confirm the grades and the document names before the number, so the commercial decision and the technical one stay separate.
Deep Reading
More systematic selection, procurement, or inspection guides.
- How to Choose a Fastener Supplier: A Sourcing Playbookwhitepaper
A more systematic guide on a related selection or inspection topic.
This article helps with selection and application. But in real projects, specifying the right part is only step one, finding the right factory, controlling quality, and delivering on time is the real challenge. We cover fasteners, rubber, plastics, and industrial textiles across four categories, from Zhejiang industrial clusters to your project site, one team, end to end.
See Our Supply Chain Capabilities →